Within the studio class this week, our group managed to create ground floor walls. The hardest part to cut and paste together was the curves at two stair-cases. We showed the teacher our 1:50 model and regarding the contours next to the driveway, he suggested it should be covered to make the courtyard flush with the driveway. Within the limited hours we have for studio class, not much were done so we decided to meet up during the week.

Ground floor floors to be pasted down.
(Done during class)

Countours next to driveway covered and first floor slab partially complete.
(Partially done in class and continued within week)

Section of first floor slab cut and detailing.
Spiral staircase area modeled.

Internal walls and roofs completed for guest house and guard house.

At the end of the night, two set of stairs was modeled, tiles cut and pasted on the first floor at living area.